Digital Infrastructure & Data Centres
Hyperscale Ready. AI Optimised.
The Killellan AI Growth Zone is designed from the ground up to support AI, quantum computing, and high-performance digital workloads. Built to client requirements from Tier 1 to Tier 4 standards, the infrastructure offers exceptional uptime, resilience, and flexibility.
Key Capabilities
Up to 99.99999% uptime for mission-critical operations
Modular architecture with plug-and-play pods for scalable deployment
Up to 2 GW energy capacity, with a roadmap to 10 GW of connections to provide resilient supply.
Direct fibre to Commsworld Network with plans for marine cable connections for global reach
Designed to blend into the land to reduce visual impact.
Modular Design for Rapid Growth
The Killellan data centre uses a modular construction model (with Schneider Electric), enabling:
30-week lead time from order to onsite installation
Compute pods supporting rack densities up to 120 kW/rack
Seamless phasing from 20 MW to 500 MW to 2 GW capacity
Initial Build (2025–2026)
Unified Operations Centre (UOC) for sitewide energy & system control of microgrid operations
1,500 m² modular data hall
AVEVA-powered energy monitoring platform
Built for you
-
Planned Triple-redundant energy architecture supports uninterrupted operations
Fully isolated island-mode capability possible for secure deployments
Physical and digital infrastructure aligned with critical national infrastructure (CNI) standards
Designed to support public sector, defence, and sensitive AI workloads
-
Connectivity is delivered through Commsworld, offering:
Dual 100 Gb fibre paths
Dark fibre integration with over 30,000 km reach
Planned marine cables to Ireland, North America.
-
A proposed on-site satellite ground station will provide backup connectivity and enhanced logistics visibility for enterprise, defence, and infrastructure users